NEOM is the most ambitious urban infrastructure project in human history. The Line, Sindalah, Oxagon — each requires a technology layer that doesn't exist yet and must be built from scratch, at scale, against compressed timelines. There are no legacy systems to integrate. There are no incumbent vendor relationships to protect. Engineering can be done right, once.
NEOM's technology requirements span smart city infrastructure, autonomous mobility systems, AI-powered urban management, and the entire digital layer of a planned city for 9 million people. Every system must be Saudi NCA-compliant, Saudi PDPL-native, and built to operate autonomously — because the whole premise of NEOM is technology-first urban design.
Our teams deploy into NEOM engagements with self-healing infrastructure as a first-class requirement — systems that diagnose and remediate without human intervention. NEOM's architecture mandates this. We build it.